EPS Room 102 Lobby Renovation


Start:1/04 Const:3/09 End: 4/09

The $2.5M EPS Lobby Renovation was designed to provide a gathering place for students, with interactive video displays of various engineering disciplines.

Architect:Contractor:
CTA Spring Corporation

Updated: 11-02-2009